South Fifth Avenue Resurfacing Project

​​

header image
Skip Navigation LinksHome » Departments » Engineering » South Fifth Avenue Resurfacing Project

Project Limits

​South Fifth Avenue from East William Street to East Madison Street​


Project Manager
Andrea Wright
[email protected]
​734.794.6410 ex.43674

Timeline

Design

Fall 2024


Construction

April - July 2025

Why is this project being done?

To improve the road surface for all. 


What work is anticipated to be done?

  • Repair identified storm drains, concrete curb and upgrade concrete ramps to meet current American with Disability Act (ADA) Standards.

  • Utility work will be completed prior to the road being resurfaced on South Fifth Avenue between East Jefferson Street and Packard Street as part of the 2025 Miscellaneous Utilities Project.

  • The first contraflow bike lane​ in the city will be installed as part of the project which will connect different cycle facilities.


Possible construction impacts

  • The road will be fully closed to users throughout the duration of the project.

  • Parking will be removed in one block of South Fifth Avenue, on the east side, from Packard to Madison to accommodate the installation of the contraflow bike lane. ​


Cost & Funding Source

  • Street, Bridge, and Sidewalk Millage​