Stone School Road Sidewalk Project

​​​​

header image
Skip Navigation LinksHome » Departments » Engineering » Stone School Road Sidewalk Project

Project Limits

Installation of a sidewalk on the east side of Stone School Road; filling in the sidewalk gap between Packard Road and Eisenhower Parkway

Stone School Sidewalk Map.jpg

Project Manager
Francisca Chan, P.E.
[email protected]
734.794.6410 x43701

For updates on the Stone School Sidewalk Project

Subscribe for Notifications

June 10, 2024 project update:

  • Construction work on Stone School between Packard and Eisenhower is scheduled to begin on June 24th, 2024. The Project includes grading, tree removals, sidewalk installation, tree plantings and restoration. The project is expected to take 6-7 weeks to complete.  
  • ​The work on this project will be performed by Doan Construction Co. of Ann Arbor, Michigan; and the City will have a daily inspector onsite.
  •  ​Normal work hours are 7 a.m. to 5 p.m. Monday thru Saturday.
​​

Timeline

​Fall to Winter 2023 - Public Engagement
Spring 2024 - Finalize Design; Bid Project
Summer 2024 - Construction & Restoration​

Why is this​​ project being done?

Filling gaps in the sidewalk system is consistent with both Ann Arbor's Moving Together Towards Vision Zero transportation plan and Complete Streets Policy. Providing sidewalks where they currently do not exist can:

  • ​Improve pedestrian safety

  • Encourage active transportation and community health

  • Provide a continuous user experience

  • Provide more transportation options

  • Eliminate the practice of walking along the road and across traffic

Sidewalk gaps throughout Ann Arbor were prioritized for completion based on a system of safety, proximity to pedestrian destinations, roadway classification adjacent to the existing sidewalk gap, resident requests, and other related criteria. For more information, visit the New Sidewalk FAQ webpage. 


Possib​le impact to residents

  • Temporary lane closure adjacent to eastern sidewalk construction, northbound traffic will be shifted to center lane (two-way traffic on Stone School Road will still be maintained).

  • Construction will unavoidably generate dust and noise and many other inconveniences. In addition, you may see utility flags, surveyor stakes, and protection fences located along the roadway which are important to construction and should not be disturbed.

  • Reconstruction of driveway aprons and some landscaping removals within the path of the new sidewalk within city of right of way is required.​

  • The project team will make every effort to avoid property impacts and will coordinate directly with specifically impacted property owners as needed.​

  • ​Access to driveways will be maintained except for periods when the sidewalk construction work is in the immediate vicinity of the driveway. 
  • ​Trash, recycle and compost collection, emergency vehicle access, and mail delivery will be maintained throughout the project. 

Cost & F​​unding Source

  • City of Ann Arbor New Sidewalk Millage

  • Township Parcel Owners (only if those parcels are ever annexed)​