January 15, 2025 2:00PM
| Multi-lane Road Reconfiguration Evaluation
| RFP 25-03
| Trevor Brydon
| Open
|
January 9, 2025 10:00AM
| Annual Street Preventative Maintenance
| RFP 25-04
| Andrea Wright
| Open
|
January 7, 2025 3:00PM
| Near-Miss Video Analytics System
| RFP 24-58
| Suzann Flowers
| Open
|
December 17, 2024 2:00PM
| Ann Arbor Fire Station 4
| RFP 24-57
Plans
Addendum 1
Addendum 2
Addendum 3
| Mike Kennedy
| Open
|
December 10, 2024 11:00AM
| Allmendinger Park Improvements
| RFP 24-56
Plans
Addendum 1
|
Madison Merzlyakov
| Closed
|
November 13, 2024 2:00PM
| Brokerage Services for 415 West Washington
|
RFP 24-55
| Derek Delacourt
| Closed
Proposal Tab
|
October 30, 2024 11:00AM
| 2024 Valve Replacement Project
| RFP 24-53
Plans
Addendum 1
|
Igor Kotlyar
| Closed
Proposal Tab
Tentative award to E.T. MacKenzie pending Council approval.
|
October 17, 2024 11:00AM
| Fuller Park Parking Lot Improvements
| RFP 24-54
Plans
| Scott Spooner
| Closed
Proposal Tab
Tentative award to Fonson pending Council approval.
|
October 11, 2024 3:00PM
| Electric Grid Asset Valuation and Municipalization Study
| RFP 24-48
| Missy Stults
| Closed
Proposal Tab
Tentative award to NewGen pending Council approval.
|
October 10, 2024 3:00PM
| Brokerage Services for Kline's Lot
| RFP 24-50
| Milton Dohoney
| Closed
Proposal Tab
|
October 1, 2024 3:00PM
| Leslie Park and Sylvan Park Bridge Replacements
|
RFP 24-51
Plans
Addendum 1
Addendum 2
| Cassandra Wagner
| Closed
Proposal Tab
Tentative award to C.A. Hull pending Council approval.
|
October 1, 2024 11:00AM
| Construction Inspection Services
| RFP 24-52
Addendum 1 | Tracy Anderson
| Closed
Proposal Tab
Tentative award to OHM, Stantec, Wade Trim and Spalding DeDecker pending Council approval.
|
September 11, 2024 3:00PM
| Fire Station 3 Building Emergency Generator
|
RFP 24-43
Addendum 1
| Mike Kennedy
| Closed
Proposal Tab
Tentative award to Huron Valley Electric pending Council approval.
|
September 11, 2024 11:00AM
| Pavement Marking Maintenance Program
| RFP 24-45
| Andrea Wright
| Closed
Proposal Tab
Tentative award to P.K. Contracting pending Council approval.
|
September 10, 2024 11:00AM
| As-Needed Directional Boring
| RFP 24-47
Addendum 1
| Cyrus Naheedy
| Closed
Proposal Tab
Tentative award to National Fiber Construction pending Council award.
|
August 23, 2024 3:00PM
| Easement and Right of Way Acquisition Services
| RFP 24-44
Addendum 1
| Francisca Chan
| Closed
Proposal Tab
Tentative award to O.R. Colan and Land Matters pending Council approval.
|
July 26, 2024 11:00AM
| Watermain Line Stops and Insertable Valves
| RFP 24-42
| Dan Wooden
| Closed
Proposal Tab
Tentative award to Watertap pending Council approval.
|
July 11, 2024 3:00PM
| Sanitary Sewer Collection System Comprehensive Plan
| RFP 24-40
Addendum 1
| Troy Baughman
| Closed
Proposal Tab
Tentative award to OHM pending Council approval.
|
July 3, 2024 3:00PM
| Demolition Projects
| RFP 24-41 Plans
Addendum 1
Addendum 2
| Adam Fercho
| Closed
Proposal Tab
Tentative award to 21st Century Salvage pending Council approval.
|
June 25, 2024 11:00AM
| Street Cut and Miscellaneous Pavement Repair
| RFP 24-39
| Dan Wooden
| Closed
Proposal Tab
Tentative award to Sommerset Paving pending Council approval.
|
June 18, 2024 3:00PM
| 2024-2025 Bridge Inspection Project
| RFP 24-35
Addendum 1
|
Francisca Chan
| Closed
Proposal Tab
Tentative award to Baker and Associates pending Council approval.
|
June 13, 2024 3:00PM
| Fleet Maintenance Management System Replacement
| RFP 24-36
Addendum 1
| Kevin Eyer
| Closed
Proposal Tab
No award made due to budget restraints.
|
June 13, 2024 11:00AM
| As-Needed Traffic Count Services
| RFP 24-37
Addendum 1
| Cynthia Redinger
| Closed
Proposal Tab
Tentative award to Quality Counts pending Council approval.
|
June 7, 2024 3:00PM
| Motor Control Centers E & F Replacement
| RFP 24-34
Plans
Addendum 1
Addendum 2
| Anne Warrow
| Closed
Proposal Tab
Tentative award to Huron Valley Electric pending Council approval.
|
May 29, 2024 11:00AM
| Barton/Bandemer Park Pedestrian Tunnel Project
| RFP 24-23
Plans
Addendum 1
Addendum 2
Addendum 3
Addendum 4
Addendum 5
|
Hillary Hanzel
| Closed
Proposal Tab
Tentative award to Davis Construction pending Council approval.
|
May 14, 2024 11:00AM
| Miller Avenue Rehabilitation
| RFP 24-19
Plans
Addendum 1
Addendum 2
Addendum 3
| Jane Allen
| Closed
Proposal Tab
Tentative award to E.T. MacKenzie pending Council approval.
|
May 13, 2024 3:00PM
| Safe Streets for All Grant Coordinator
| RFP 24-28
Addendum 1
| Suzann Flowers
| Closed
Proposal Tab
Tentative award to Sam Schwartz pending Council approval.
|
May 8, 2024 3:00PM
| Fire Station #1 Roof Installation
| RFP 24-21
Addendum 1
|
Matthew Kulhanek
| Closed
Proposal Tab
Tentative award to Duke Roofing pending Council approval.
|
May 7, 2024 3:00PM
| Playground Improvement Services
|
RFP 24-31
| Adam Fercho
| Closed
Proposal Tab
Tentative award to Michigan Recreational Construction pending Council approval.
|
May 7, 2024 11:00AM
| Huron River Drive Culvert Replacement
| RFP 24-20
Plans
Addendum 1
| Nicholas Bayley
| Closed
Proposal Tab
Tentative award to E.T. MacKenzie pending Council approval.
|
May 1, 2024 3:00PM
| Liberty Plaza Planting Improvements
| RFP 24-30
Plans
|
Adam Fercho
| Closed
No responses received.
|
May 1, 2024 2:00PM
| Construction Engineering for Barton/Bandemer Park Pedestrian Tunnel Project
|
RFP 24-22
Addendum 1
| Hillary Hanzel
| Closed
Proposal Tab
Tentative award to Wade Trim pending Council approval.
|
April 24, 2024 11:00AM
| Pump Maintenance and Repair Services
| RFP 24-24
|
Nicholas Baran
| Closed
Proposal Tab
Tentative award to Kennedy Industries and KSB Dubric pending Council approval.
|
April 23, 2024 3:00PM
| 2024 On-Call Sewer System Services
| RFP 24-27
Addendum 1
|
Kyle Pettibone
| Closed
Proposal Tab
Tentative award to SAK pending Council approval.
|
April 18, 2024 3:00PM
| Unarmed Crisis Response Implementation
|
RFP 24-16
Addendum 1
| Milton Dohoney
| Closed
No responses received.
|
April 18, 2024 11:00AM
| Granular Activated Carbon (GAC) Regeneration and Replacement
| RFP 24-29
|
Nicholas Baran
| Closed
Proposal Tab
Tentative award to Carbon Activated pending Council approval.
|
April 16, 2024 3:00PM
| Routine Street Tree Pruning & General Forestry Services
| RFP 24-26
| Tiffany Giacobazzi
| Closed
Proposal Tab
Tentative award to PPM Tree Service pending Council approval.
|
April 16, 2024 11:00AM
| Fall 2024 / Spring 2025 Elizabeth Dean Fund Tree Purchase and Planting
|
RFP 24-25
|
Tiffany Giacobazzi
| Closed
Proposal Tab
Tentative award to Margolis pending Council approval.
|
April 11, 2024 3:00PM
| Fire Station 1 Masonry Replacement & Repair
| RFP 24-18
Addendum 1
| Mike Kennedy
| Closed
Proposal Tab
Tentative award to Bornor Restoration.
|
April 2, 2024 3:00PM
| 2024 Sidewalk Gap Project
| RFP 24-14
| Francisca Chan
| Closed
Proposal Tab
Tentative award to Doan pending Council approval.
|
March 28, 2024 2:00PM
| Yorkshire, Independence and Medford (Y.I.M.) Watermain Replacement Project
| RFP 24-17
Plans
Addendum 1
|
Jeremy Schrot
| Closed
Proposal Tab
Tentative award to E.T. MacKenzie pending Council approval.
|
March 26, 2024 3:00PM
| Veterans Park Shelter Demolition
| RFP 24-15
Plans
|
Rachel Jackson
| Closed
Proposal Tab
No award made due to budget restraints.
|
March 21, 2024 3:00PM
| Design Services for Pontiac Trail Roundabouts
|
RFP 24-12
Addendum 1
|
Nicholas Bayley
| Closed
Proposal Tab
Tentative award to Fishbeck pending Council approval.
|
March 19, 2024 11:00AM
| Ann Arbor Senior Center Siding
|
RFP 24-09
| Jason Nealis
| Closed
No responses received.
|
March 14, 2024 3:00PM
| Design Services for the Election Center Renovation Project
| RFP 24-11
Addendum 1
|
Matthew Kulhanek
| Closed
Proposal Tab
Tentative award to DiClemente Siegel Design pending Council approval.
|
March 7, 2024 3:00PM
| Barton Dam Right Embankment Remediation
| RFP 24-03
Plans
Addendum 1
Addendum 2
| Steve McManus
| Closed
Proposal Tab
Tentative award to Michels Construction pending Council approval.
|
March 5, 2024 11:00AM
| 2024 Miscellaneous Utilities Project
| RFP 24-10
Plans
Addendum 1
Addendum 2
| Tracy Anderson
| Closed
Proposal Tab
Tentative award to Fonson pending Council approval.
|
February 28, 2024 11:00AM
| 2024 Sidewalk Leveling Repair Project
| RFP 24-13
| Theresa Bridges
| Closed
Proposal Tab
|
February 27, 2024 11:00AM
| S. Seventh St. and Greenview Improvements
| RFP 24-08
Plans
Addendum 1
Addendum 2
Addendum 3
Addendum 4
| Tracy Anderson
| Closed
Proposal Tab
Tentative award to Miller Bros pending Council approval.
|
February 22, 2024 11:00AM
| 2024 Annual Resurfacing Program
| RFP 24-04
Plans
Addendum 1
| Andrea Wright
| Closed
Proposal Tab
Tentative award to Cadillac Asphalt pending Council approval.
|
February 20, 2024 3:00PM
| WTP Professional Engineering Services
| RFP 24-02
|
Glen Wiczorek
| Closed
Proposal Tab
Tentative award to Fishbeck, Stantec and Jacobs pending Council approval.
|
February 14, 2024 3:00PM
| 2024 Sidewalk Cutting Repair Project
| RFP 24-07
| Theresa Bridges
| Closed
Proposal Tab
Tentative award to Precision Concrete pending Council approval.
|
February 14, 2024 1:00PM
| 2024 Sidewalk Leveling Repair Project
| RFP 24-06
Addendum 1
| Theresa Bridges
| Closed
No responses received.
|
February 14, 2024 11:00AM
| 2024 Sidewalk Replacements Repair
| RFP 24-05
Addendum 1
| Theresa Bridges
| Closed
Proposal Tab
Tentative award to Doan pending Council approval.
|
January 30, 2024 3:00PM
| Home Energy Score Assessment Services
| RFP 24-01
Addendum 1
|
Steve Christensen
| Closed
Proposal Tab
Tentative award to Air Doctors, Integrity Inspections, OHMI/Energy Veteran Solutions and Integrity Partners pending Council approval.
|
January 23, 2024 3:00PM
| Supportive Connections Office Space Renovations
| RFP 23-68
Plans
Addendum 1
| Karen Field
| Closed
Proposal Tab
Tentative award to Spence Brothers pending Council approval.
|
December 19, 2023 3:00PM
| Crescents Water Main Replacement and Resurfacing
| RFP 23-61
Plans
Addendum 1
Addendum 2
| Nicholas Bayley
| Closed
Proposal Tab
Tentative award to DiPonio pending Council approval.
|
December 19, 2023 11:00AM
| 2024 and 2025 Construction Material Testing Services
| RFP 23-66
| Francisca Chan
| Closed
Proposal Tab
Tentative award to G2, MTC, Intertek/PSI and DLZ pending Council approval.
|
December 14, 2023 11:00AM
| Huron West Park Sanitary Sewer Replacement Phases 2 & 3
| RFP 23-62
Plans
Addendum 1
| Brian Slizewski
| Closed
Proposal Tab
Tentative award to Pamar pending Council approval.
|
December 13, 2023 3:00PM
| Content Management System Replacement
| RFP 23-64
Addendum 1
| Kevin Eyer
| Closed
Proposal Tab
Tentative award to GHD Digital pending Council approval.
|
December 13, 2023 11:00AM
| Geothermal Advisory Services
|
RFP 23-65
Addendum 1
| Missy Stults
| Closed
Proposal Tab
Tentative award to Stantec pending Council approval.
|
December 12, 2023 3:00PM
| Parks & Recreation Asset Management Plan
|
RFP 23-67
Addendum 1
| Adam Fercho
| Closed
Proposal Tab
Tentative award to OHM pending Council approval.
|
November 29, 2023 3:00PM
| Comprehensive Stormwater Management Plan
| RFP 23-63
Addendum 1
|
Jennifer Lawson
| Closed
Proposal Tab
Tentative award to Tetra Tech pending Council approval.
|
November 16, 2023 11:00AM
| East Medical Center Drive Bridge Rehabilitation and Widening Project
| RFP 23-59
Plans
Addendum 1
Addendum 2
|
Francisca Chan
| Closed
Proposal Tab
Tentative award to C.A. Hull pending Council approval.
|
November 15, 2023 3:00PM
| Ambulance Fee Collection Services
| RFP 23-60
Addendum 1
| Mike Kennedy
| Closed
Proposal Tab
Tentative award to Medicount pending Council approval.
|
November 8, 2023 3:00PM
| Public Engagement Hub
| RFP 23-58
Addendum 1
| Kevin Eyer
| Closed
Proposal Tab
Tentative award to Social Pinpoint pending Council approval.
|
November 7, 2023 3:00PM
| Engineering Consulting Services
| RFP 23-52
|
Hillary Hanzel
| Closed
Proposal Tab
Tentative award to OHM, Rowe, SmithGroup and Beckett & Raeder pending Council approval.
|
November 7, 2023 11:00AM
| Architecture Consulting Services
| RFP 23-53
Addendum 1
|
Hillary Hanzel
| Closed
Proposal Tab
Tentative award to HRC, A3C and InToto pending Council approval.
|
November 1, 2023 3:00PM
| Water Distribution Plan & Model Update
| RFP 23-57
Addendum 1
| Troy Baughman
| Closed
Proposal Tab
Tentative award to OHM pending Council approval.
|
October 25, 2023 3:00PM
| Executive Recruitment Services - Human Resources & Labor Relations Director
| RFP 23-56
| Milton Dohoney
| Closed
Proposal Tab
Tentative award to GovHR pending Council approval.
|
October 18, 2023 11:00 AM
| Barton Nature Area Border to Border Trail
|
RFP 23-54
Plans
Addendum 1
| Hillary Hanzel
| Closed
Proposal Tab
Tentative award to Erie Construction pending Council approval.
|
October 17, 2023 11:00AM
| Ultraviolet (UV) Disinfection System Replacement Project
| RFP 23-50
Plans
Addendum 1
Addendum 2
Addendum 3
|
Anne Warrow
| Closed
Proposal Tab
Tentative award to Commercial Contracting Corporation pending Council approval.
|
October 10, 2023 3:00PM
| Routine Park Tree Pruning & Park Forestry Services
| RFP 23-47
|
Scott Spooner
| Closed
Proposal Tab
Tentative award to Davey Tree pending Council approval.
|
October 10, 2023 11:00AM
| Public Works On-Call Construction Services
| RFP 23-55
| Kyle Pettibone
| Closed
Proposal Tab
Tentative award to E.T. MacKenzie pending Council approval.
|
October 5, 2023 11:00AM
| Enterprise Chatbot
| RFP 23-51
Addendum 1
| Kevin Eyer
| Closed
Proposal Tab
Tentative award to Citibot pending Council approval.
|
October 3, 2023 3:00PM
| Administrator of Home Energy Advisor Program
| RFP 23-49
Addendum 1
Addendum 2
| Julie Roth
| Closed
Proposal Tab
Tentative award to Walker Miller pending Council approval.
|
October 3, 2023 11:00AM
| Community Climate Action Residential Rebate Administrator
| RFP 23-48
Addendum 1
| Thea Yagerlener
| Closed
Proposal Tab
Tentative award to Elevate pending Council approval.
|
September 21, 2023 3:00PM
| Promotional Assessment of AAPD Officers
| RFP 23-46
| Marianne Frank
| Closed
Proposal Tab
Tentative award to Morris & McDaniel pending Council approval.
|
September 21, 2023 11:00AM
| Unarmed Response Implementation
| RFP 23-42
| Milton Dohoney
| Cancelled
Proposal Tab
|
September 7, 2023 3:00PM
| 2023 Sewer Lining Project
| RFP 23-41
Plans
Addendum 1
|
Igor Kotlyar
| Closed
Proposal Tab
Tentative award to SAK pending Council approval.
|
September 6, 2023 3:00PM
| Certified Laboratory for PFAS, Water and Wastewater Testing
| RFP 23-44
Addendum 1
| LJ Melrose
| Closed
Proposal Tab
Tentative award to Merit and Paragon pending Council approval.
|
September 6, 2023 11:00AM
| Non-Union Compensation Study
| RFP 23-43
Addendum 1
| L. Orta
| Closed
Proposal Tab
Tentative award to Gallagher pending Council approval.
|
August 29, 2023 11:00AM
| Miscellaneous Concrete Repairs
|
RFP 23-45
| Kevin Schneider
| Closed
Proposal Tab
Tentative award to Saladino pending Council approval.
|
August 17, 2023 11:00AM
| Citywide Drainage Analysis for Gravel Roads
| RFP 23-40
Addendum 1
|
Jennifer Lawson
| Closed
Proposal Tab
Tentative award to HRC pending Council approval.
|
August 15, 2023 2:00PM
| Sanitary Sewer Flow Metering Services
| RFP 23-39
Addendum 1
|
Troy Baughman
| Closed
Proposal Tab
Tentative award to ADS pending Council approval.
|
July 21, 2023 2:00PM
| Cost of Service Study for Solid Waste Unit
| RFP 23-38
Addendum 1
| Sarah Mason
| Closed
Proposal Tab
Tentative award to MSW Consultants.
|
July 20, 2023 2:00PM
| Pittsfield Village Improvements Project
| RFP 23-34
| Igor Kotlyar
| Closed
Proposal Tab
Tentative award to OHM pending Council approval.
|
June 29, 2023 2:00PM
| WWTP Electrical Preventative Maintenance
| RFP 23-33
Addendum 1
Addendum 2
|
Adam Smith
| Closed
Proposal Tab
Tentative award to Premier Power Maintenance pending Council approval.
|
June 28, 2023 2:00PM
| Replacement of Overhead Rolling Steel Door and Operator
| RFP 23-36
Addendum 1
| Tom Oldakowski
| Closed
Proposal Tab
Tentative award to Allied Building.
|
June 13, 2023 2:00PM
| On-Call Electrical and Instrumentation Services
| RFP 23-32
| Adam Smith
| Closed
Proposal Tab
Tentative award to UIS pending Council approval.
|
May 31, 2023 2:00PM
| On-Demand Fiber Optic Architecture, Engineering, Design and Construction
| RFP 23-31
| Tom Shewchuk
| Closed
Proposal Tab
Tentative award to TurnKey Network Solutions pending Council approval.
|
May 24, 2023 2:00PM
| Routine Street Tree Pruning & General Forestry Services
| RFP 23-30
|
Tiffany Giacobazzi
| Closed
Proposal Tab
Tentative award to Davey Tree pending Council approval.
|
May 23, 2023 2:00PM
| General Civil Engineering and Surveying Services
| RFP 23-27
Addendum 1
| Andrea Wright
| Closed
Proposal Tab
Tentative award to OHM, Wade Trim, Spalding DeDecker and Fishbeck pending Council approval.
|
May 23, 2023 10:00AM
| Earhart Road Improvements Project
| RFP 23-25
Plans
Addendum 1
Addendum 2
| Nicholas Bayley
| Closed
Proposal Tab
Tentative award to Cadillac Asphalt pending Council approval.
|
May 18, 2023 2:00PM
| City Hall Guest Services
| RFP 23-29
| Matthew Kulhanek
| Closed
Proposal Tab
Tentative award to Liberty Security Group pending Council approval.
|
May 18, 2023 10:00AM
| Janitorial Services at Various City Facilities
| RFP 23-28
Addendum 1
| Matthew Kulhanek
| Closed
Proposal Tab
Tentative award to LGC Global pending Council approval.
|
May 17, 2023 2:00PM
| Third Party Administrative Services for Risk Management
| RFP 23-24
Addendum 1
|
Michael J. Pettigrew
| Closed
Proposal Tab
Tentative award to Hylant pending Council approval.
|
May 17, 2023 10:00AM
| Street Resurfacing Project - 2023
|
RFP 23-17
Plans
Addendum 1
Addendum 2
| Andrea Wright
| Closed
Proposal Tab
Tentative award to Cadillac Asphalt pending Council approval.
|
May 11, 2023 10:00AM
| On-Call Electrical Services
|
RFP 23-26
|
Matthew Kulhanek
| Closed
Proposal Tab
Tentative award to Harper Electric pending Council approval.
|
May 10, 2023 2:00PM
| Ellsworth Road Resurfacing Project
|
RFP 23-23
Plans
Addendum 1
|
Jeremy Schrot
| Closed
Proposal Tab
Tentative award to Cadillac Asphalt pending Council approval.
|
April 26, 2023 2:00PM
| On-Site Wellness and Tactical Athlete Fitness Services
| RFP 23-18
Addendum 1
| Doug Forsyth
| Cancelled
Proposal Tab
|
April 26, 2023 10:00AM
| Pontiac, Swift, Moore and Wright Watermain and Resurfacing Project
|
RFP 23-22
Plans
Addendum 1
Addendum 2
|
Christopher Wall
| Closed
Proposal Tab
Tentative award to Bailey Excavating pending Council approval.
|
April 25, 2023 2:00PM
| Feasibility Analysis of Select Stormwater Projects
|
RFP 23-21
Addendum 1
| Jennifer Lawson
| Closed
Proposal Tab
Tentative award to Tetra Tech pending Council approval.
|
April 25, 2023 10:00AM
| Geddes Avenue and 2190 South State Street Retaining Walls
|
RFP 23-11
Plans
Addendum 1
| Tracy Anderson
| Closed
Proposal Tab
Tentative award to Z Contractors pending Council approval.
|
April 20, 2023 2:00PM
| Landfill Cover Improvements
| RFP 23-20
Addendum 1
|
Kyle Pettibone
| Closed
Proposal Tab
Tentative award to D&R Earthmoving pending Council approval.
|
April 18, 2023 10:00AM
| Crescents Water Main Replacement and Resurfacing Phase 1 Project
| RFP 23-19
Plans
Addendum 1
|
Nicholas Bayley | Cancelled
Proposal Tab
|
April 14, 2023 2:00PM
| Solar and Energy Storage Installations for City Sites
| RFP 23-15
Addendum 1
Addendum 2
| Simi Barr
| Closed
Proposal Tab
|
April 13, 2023 10:00AM
| Veterans Memorial Park Ice Arena Improvements
| RFP 23-03
Plans
Addendum 1
Addendum 2
|
Adam Fercho
| Closed
Proposal Tab
Tentative award to Ram Construction pending Council approval.
|
April 5, 2023 10:00AM
| Brooks Street Improvements Project
| RFP 23-09
Plans
Addendum 1
| Theresa Bridges
| Closed
Proposal Tab
Tentative award to Bailey Excavating pending Council approval.
|
April 4, 2023 2:00PM
| Veterans Memorial Park Shelter Demolition
| RFP 23-02
Plans
Addendum 1
|
Adam Fercho
| Cancelled
Proposal Tab
|
March 30, 2023 2:00PM
| Public Works / Systems Planning General Engineering Services
|
RFP 23-16
Addendum 1
|
Kyle Pettibone
| Closed
Proposal Tab
Tentative award to OHM, Tetra Tech and HRC pending Council approval.
|
March 30, 2023 10:00AM
| W. Madison - Madison Place Water Main Replacement and Resurfacing
|
RFP 23-08
Plans
Addendum 1 | Brian Slizewski
| Closed
Proposal Tab
Tentative award to Fonson pending Council approval.
|
March 21, 2023 2:00PM
| Research Park Drive Resurfacing Project
| RFP 23-10
Plans
Addendum 1
|
Jeremy Schrot
| Closed
Proposal Tab
Tentative award to Ajax Paving pending Council approval.
|
March 13, 2023 2:00PM
| Wastewater Treatment Plant UV Disinfection Equipment
|
RFP 23-13
Addendum 1
Addendum 2
| Anne Warrow
| Closed
Proposal Tab
Tentative award to Trojan Technologies pending Council approval.
|
March 9, 2023 2:00PM
| 2023 Sewer Televising and Cleaning
| RFP 23-14
Addendum 1
| Matt Waldsmith
| Closed
Proposal Tab
Tentative award to Taplin Group and Rogue Industrial pending Council approval.
|
March 2, 2023 2:00PM
| Old Fourth Ward Historic District Survey
|
RFP 23-12 | Jill Thacher
| Closed
Proposal Tab
Tentative award to Commonwealth Heritage Group pending Council approval.
|
March 1, 2023 2:00PM
| Removal of Residual Limestone
|
RFP 23-07
|
Jeff Keown
| Closed
Proposal Tab
Tentative award to Prolime pending Council approval.
|
February 16, 2023 2:00PM
| 2023 Geotechnical & Environmental Services
| RFP 23-06
|
Andrea Wright
| Closed
Proposal Tab
City Council approved award to Tetra Tech, Mannik & Smith Group and Materials Testing Consultants
|
February 16, 2023 10:00AM
| 2023 Miscellaneous Utility Projects
| RFP 23-05
Plans
Addendum 1
|
Chris Elenbaas
| Closed
Proposal Tab
Tentative award to Fonson pending Council approval.
|
February 1, 2023 2:00PM
| Administration and Evaluation of a Pilot Guaranteed Income Project
|
RFP 22-78
Budget Spreadsheet
Addendum 1
|
John Fournier
| Closed
Proposal Tab Tentative award to University of Michigan Poverty Solutions pending Council approval.
|
January 26, 2023 2:00PM
| Broadway Street Water Main Replacement and Resurfacing Project
| RFP 23-04
Plans
Addendum 1
Addendum 2
| Nicholas Bayley
| Closed
Proposal Tab
City Council Approved Award to Bailey Excavating
|
January 18, 2023 2:00PM
| Carbon Replacement in Odor Control Units
| RFP 23-01
Addendum 1
Addendum 2
|
Nicholas Jaworski
| Closed
Proposal Tab
Tentative award to Carbon Activated pending Council approval.
|
January 12, 2023 2:00PM
| Wheeler Center Lighting Improvements
|
RFP 22-83
Addendum 1
Addendum 2
|
Maddie Snable
| Closed
Proposal Tab
Tentative award to AF Smith pending Council approval.
|
January 6, 2023 2:00PM
| Municipal Building Decarbonization and Electrification Assessment
| RFP 22-81
Addendum 1
| Simi Barr
| Cancelled
Proposal Tab
|
---|